COURSE OVERVIEW
DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation
OVERVIEW
COURSE TITLE | : | DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation |
COURSE DATE | : | Mar 04 - Mar 07 2024 |
DURATION | : | 4 Days |
INSTRUCTOR | : | Dr. Chris Kapetan |
VENUE | : | Dubai, UAE |
COURSE FEE | : | $ 6750 |
Request For Course |
OTHER SCHEDULED DATES
Date | : | Jun 03 - Jun 06 (4 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Sep 09 - Sep 12 (4 Days) | Location | : | Al Khobar, KSA | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Dec 09 - Dec 12 (4 Days) | Location | : | Istanbul, Turkey | Classroom Fee (US$) | : | $ 7250 | Course Info |
Course Description
This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. Recent Advances in drilling and completion have resulted in a rapid increase in the number of horizontal and multilateral wells drilled each year around the world. A horizontal well, to some extent, is different from a vertical well because it requires an interdisciplinary interaction between various professionals, such as geologists, reservoir engineers, drilling engineers, production engineers, and completion engineers. A typical horizontal well project is different from a vertical well project because productivity of a well depends upon the well length. Moreover, the well length depends upon the drilling and completion techniques implemented. Multilateral well technology is revolutionizing the way that reservoirs are accessed by wells. The ability to create wells with multiple branches that can target widely spaced reservoir compartments provides engineers unlimited options in optimizing economic extraction of oil and gas. Along with this opportunity comes the inherent complexity of these well architectures.The course also analyzes the successes and failures of well integrity management from a series of real case studies in the oilfield and production facilities around the globe. During the course, the participants will review and discuss the requirements of operators and regulatory authorities for integrity assurance in wells and production facilities. They will also gain knowledge in the completion techniques and design of wells in increasingly complex field developments to ensure well integrity, failure-free and long-life production.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies as a percentage of the total tuition hours
LecturesWorkshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators
In an unlikely event, the course instructor may modify the above training methodology before or during the course for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable
Certificates | : | Only soft copy certificates will be issued to participants through Haward’s Portal. This includes Wallet Card Certificates if applicable |
Training Materials | : | Only soft copy Training Materials (PDF format) will be issued to participant through the Virtual Training Platform |
Training Methodology | : | 80% of the program will be theory and 20% will be practical sessions, exercises, case studies, simulators or videos |
Training Program | : | The training will be for 4 hours per day starting at 09:30 and ending at 13:30 |
H-STK Smart Training Kit | : | Not Applicable |
Hands-on Practical Workshops | : | Not Applicable |
Site Visit | : | Not Applicable |
Simulators | : | Only software simulators will be used in the virtual courses. Hardware simulators are not applicable and will not be used in Virtual Training |
RELATED COURSES
DE0815 : Water Flooding: Understand Water Flooding, Reservoir Souring & Water Breakthrough
- Date : Nov 17 -Nov 21 / 3 Days
- Location : Doha, Qatar
- Course Details Register
DE1014 : Stuck Pipe Prevention & Fishing Operation
- Date : Nov 18 -Nov 21 / 3 Days
- Location : Abu Dhabi, UAE
- Course Details Register
DE0975 : Stuck Piping & Fishing Operation
- Date : Dec 16 -Dec 19 / 3 Days
- Location : Dubai, UAE
- Course Details Register
DE0610 : Advanced Drilling Technology
- Date : Nov 18 -Nov 21 / 3 Days
- Location : Abu Dhabi, UAE
- Course Details Register